(3) The budget cost and actual cost are compared and analyzed. 1. (4) During the hoisting of the composite plate and composite beam, some components need to be placed on
The site is evenly and orderly arranged. The West and North facades are relatively full and full. Modular design is carried out in combination with the technical characteristics of prefabricated
The group standard BIM application depth standard for civil construction of building engineering edited by our company has been officially implemented since June 10, 2021, and the standard number is