The General Code for Civil Buildings will be implemented on March 1 next year, and the new regulations will be issued frequently. The


How to solve the blind spots and doubts in a large number of specifications.

Content and depth of data submission at the construction drawing design stage 1 Requirements for mutual submission of data between construction drawing design disciplines 2.

3.

Submission of the first, second and third versions of data for construction drawing design: submission of data for architecture/other disciplines/receipt of verified data Live broadcast expert: Wang Licheng▼, architectural designer and senior engineer of China Zhongyuan International Engineering Co., Ltd., once worked in Beijing Dongfang Huamai Engineering Co., Ltd., Gansu Survey and Design Institute of MCC Construction Engineering Group Co., Ltd., and Gansu Light Textile Industrial Design Institute Co., Ltd, During this period, I participated in the live broadcast of the contents and common problems of the courseware of various architectural design experts, such as the construction drawings of the super large basements of residential quarters, businesses, offices, hotels, libraries, museums, and many large hospitals.

Such as the setting of fire lanes in multi-storey buildings, whether it is necessary to set up wartime standby ports, the division of super large atriums, super fire compartment, etc.

Content and depth of data submission at the preliminary design stage 1.

2.

Whether the drawing depth meets the requirements.

Such as laws, regulations, rules, mandatory national standards, recommended national standards, landmarks, atlases, technical measures, expert opinions and other conflicts.

are within the scope of planning permission.

2.

Whether the mandatory provisions in the current project construction standards (national, industrial and local) are met.

5.

Vertical layout 1) Rationality of vertical design, meeting flood control and waterlogging requirements, meeting rainwater drainage requirements of the site, reasonably organizing the vertical within the site, meeting smooth connection between the site and municipal roads, meeting outdoor rainwater and sewage pipeline drainage requirements, and reasonably reducing earthwork quantities.

How on earth can we ensure quality and quantity by drawing from the source with drawing review thinking, strengthen the company’s self review, and reduce the pressure and responsibility risk of subsequent drawing review and change? 38 The full text has been issued intensively with strong regulations.

3.

Architects’ lifelong responsibility system, where are the key risks and how to avoid risks.

The content and depth of the information provided in the scheme design stage.

1 The construction discipline provides data to other disciplines (content and depth of data submission) 2.

2.

How to solve the problem of transition period of new regulations in the design.

2.

Lifting Clutches

The main contents were as follows: 1.

The following problems are solved by combining actual engineering cases with relevant laws and regulations: 1.

2 Explaining the cooperation issues of the construction drawing design profession: 1.

4.

The new national standard system has been updated, and 38 full texts of strong regulations have been issued intensively.

Review whether the planning conditions, land use, plot ratio, building density, withdrawal, etc.

1.

[Construction drawing design review engineer (civil architecture discipline)] 17 live broadcasts+class communication group+experts answer questions and master common problems and key elements of building drawing review The last 2 days | Sign up for a new code interpretation video course ▼ Solve common problems in construction drawing design from the design perspective+review perspective General drawing+building fire protection (structural fire resistance/thermal insulation/external wall thermal insulation) +Fire and civil air defense+safety protection+waterproof+green building+material structure+professional cooperation live broadcast details are as follows ▼ [Overview] General introduction to building construction drawing review live broadcast 1.

2.

Live broadcast expert: Hao Wenjing ▼, senior architect, national first-class registered architect, chief architect of China Wuzhou Engineering Design Group Co., Ltd., architectural director, project leader, has experience in theater, auditorium, gymnasium, school, hospital, residence, office building, museum, exhibition hall, transformation and other construction projects, and has experience in the whole process of scheme design, preliminary design, construction drawing design, project residence, etc, Participated in the compilation of the national code General Code for Building Protection and Anticorrosion.

Six architectural design experts were specially invited to sort out and analyze the common problems in the design review of architectural construction drawings in the form of 17 live broadcasts+class group exchanges+expert answers.

Some experts summarized and shared the screenshot of the code.

Data submission in the first, second and third versions of the preliminary design: architecture/other disciplines provide data/receive verification data 4.

1.

The principle for each profession to provide information to each other.

Requirements for mutual data submission between the preliminary design disciplines 2.

In August 2022, the Ministry of Housing and Urban Rural Development issued the announcement of the national standard General Specifications for Civil Buildings, which clearly stated that the full text of the announcement was the specification as a mandatory engineering construction specification, which will be implemented from March 1, 2023.

The preparation basis, the implementation of the planning and other departments’ replies, and whether the specifications and procedures were complete.

General layout 1) Depth problems and contents easy to be missed; 2) General layout fire protection: building fire separation distance, fire lane, fire climbing operation site; 3) The relevant requirements of the general layout of various construction standards need to be met, including the relevant contents of green buildings, barrier free design, rainwater control and utilization, the setting of site entrances and exits and car ramp entrances and exits, the relevant contents of the general civil air defense plan, and the special standards of various buildings.

Other disciplines receive verification data 3.

The responsibilities of different design posts: 1) Designer.

4.

Standardizing intensive release, drawing review reform, and lifelong responsibility system of architects have increased the responsibility and pressure of drawing review of architects.

[Professional cooperation issues] The construction drawing design profession cooperated with the live broadcast.

How to solve the transition period of new regulations? How to avoid risks in the life-long responsibility system of designers? How to solve various problems in drawing review from the design source after repeated adjustment of construction drawings? Joint inspection of all departments, civil air defense/fire protection/general drawing/green building…

How to cut responsibility with the cooperation of multiple types of work and multiple units.

Discipline leader.

2) Rationality of site rainwater drainage organization design, setting of drainage facilities, and relevant contents of sponge city design..

2.

there are many requirements, how to better pass the drawing review? In order to solve the above problems, China Construction Research Science and Technology Education Innovation Center of China Academy of Building Sciences hereby launches the training of Construction Drawing Design Review Engineer (Civil Architecture).

2、 Common problems in general construction drawing 1.

3.

The main contents of the general construction drawing.

General principles.

In the design, various provisions are often complicated and contradictory, and how to choose and judge the standard provisions in the design.