Architectural doggerel (too talented)


Masonry worker 5.

  6.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

²  The simple wooden stool is unreliable, and the operation platform shall be firm; ²  Safety belt at edge opening and hat belt for climbing operation; ²  The hanging basket is limited to two people, and the life rope is tightly tied; ²  Cross operation is difficult to take into account, and special parts shall be protected.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

General workers: v   Strange environment is dangerous, and the edge hole is easy to fall; v   Work after drinking will have an accident.

2.3 formwork removal: ²  The formwork removal operation shall be permitted, and the formwork shall be erected first and then removed according to the regulations; ²  Be sure not to pry violently and stand in the correct position to prevent self injury.

u   Improving consciousness, receiving education and obeying management are obligations; u   Wear all labor protection articles and operate according to regulations to reduce injury.

²  Don’t walk around in a strange environment, be alert to the edge and the hole; ²  Special operations shall be carried out by specially assigned personnel, and four do not harm the mind.

Construction elevator driver 14.

3.2 reinforcement lifting: ²  The reinforcement shall be firmly tied for lifting, and the short materials shall be hung in a basin; ²  No one is standing under the suspended object, and the rope head can only wear a transverse pin.

Plasterer 6.

Scaffolder 8.

Ø   In case of danger, calm down first; Rescue and report.

Throw yourself into the cell at high altitude.

      2.

Doggerel of common types of work in building construction 1.

High place operation basket operator: v   As soon as the counterweight fails, the master immediately falls off; v   It’s no accident that you fall into a basket in the air.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

  3.

  5.

Welder 11.

u   Keep in mind the contents of disclosure, obey management and discipline; u   The structural measures shall be carried out together with self inspection and mutual inspection according to the specifications.

Ø   If people are injured, stop bleeding first; If people are poisoned, prohibit blind rescue; Ø   If you fall high, don’t carry it; Carry on a stretcher and send to a doctor urgently.

u   It is very important to obey the management, and report the hidden dangers found; u   Wear labor protection articles, abide by regulations and discipline, and avoid injury.

Construction electrician 10.

  7.

Bricklayer: v   Bricks piled near the edge are easy to fall, and objects falling from height are harmful; v   High altitude operation is easy to fall, and excessive stacking will collapse.

  9.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

²  Electricians shall have certificates and complete personal protection; ²  The power test operation shall not be less.

Construction electrician: v   Live operation is easy to get an electric shock, and it is dangerous to pull and connect without permission; v   If you don’t hang a tag for maintenance after power failure, you will be injured by electric shock.

Reinforcement worker: v   Reinforcement rebound is easy to hurt people, lifting injury and electric shock; v   Excessive stacking will collapse and high-altitude operation is at risk.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

  8.

Erection Anchor

Ø   In case of danger, calm down first; Rescue and report.

u   Management of compliance with regulations and discipline, and wear labor protection articles; u   Receive education, know the risks and eliminate the hidden dangers in time.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

General worker 2.

²  Enter the site only after passing the physical examination, and take the post again after education disclosure; ²  Don’t go to work after drinking.

Ø   In case of danger, calm down first; Rescue and report.

Ø   In case of electric shock, cut off the power supply; In case of fire, put it out.

Formwork worker: v   The fire is very dangerous, and the formwork shall be removed carefully; v   It is easy to fall from height and the machine will bite.

u   Welding operation shall have certificate, and it is very important to obey management; u   The initial fire shall be extinguished, and the disclosure contents shall be kept in mind.

Tower crane driver 13.

Ø   In case of electric shock, cut off the power supply; In case of fire, put it out.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

Ø   In case of electric shock, cut off the power supply; In case of fire, put it out..

2.1 formwork fabrication: ²  Take gloves for cutting materials, and never saw short wood; ²  The sawdust and shavings shall be cleared in time, and the smoking and fire prohibition shall be kept in mind.

Construction hoisting machinery installation and disassembly worker 12.

u   Special operation certificates and labor protection articles shall be worn in place; u   Be aware of risks, be educated, standardize operation and abide by discipline.

It seems that you are not careless; v   Cross operation is risky, and hanging baskets are used to prevent falling.

²  Work only when the two certificates are complete, and wear insulated shoes; ²  Reduce pressure, temper and prevent exposure to the sun, and fix and separate the gas cylinders; ²  Clean flammable materials frequently, catch fire and take care of fire extinguishers; ²  After checking the ignition and welding, evacuate after clearing the site.

²  Good health and spirit, special qualifications can not be less; ²  Safety belt shall be used on the rack, and the safety helmet belt shall be fastened; ²  Shoes for work shall be anti-skid and shall be erected and disassembled in order without crossing; ²  Do not loose the steel pipe fasteners and do not litter the removed materials.

  4.

²  The basket operation is limited to two people, and the life rope shall be fastened at all times; ²  Load control should bear in mind that the basket can not be used as an elevator; ²  Regularly inspect the safety lock, and do not tamper with the protection effect; ²  The heavy hammer shall be safely off the ground, and the power supply shall be turned off when landing and leaving the basket.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

Ø   In case of danger, calm down first; Rescue and report.

Ø   In case of danger, calm down first; Rescue and report.

u   Comply with regulations, discipline and service management, and keep the disclosure content in mind; u   The basket operation shall follow the rules, and illegal operation is not allowed.

u   Management of compliance with regulations and discipline, and wear labor protection articles; u   Accept education, know risks, find hidden dangers and report problems.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

Reinforcement worker 4.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

Ø   In case of electric shock, cut off the power supply; In case of fire, put it out.

Throw a parable at high altitude and hit your head.

Ø   In case of electric shock, cut off the power supply; In case of collapse, avoid danger first; Ø   In case of fire, put it out; No, call the police.

Scaffolder: v   High shelf anti falling, multi material anti strike.

Formwork worker 3.

u   Save materials according to the construction drawings, and keep a good record of the disclosure contents; u   Compliance with regulations and discipline, management of clothes, elimination of hidden dangers, high awareness.

Concrete worker V   The anti falling of the edge opening and the anti electricity of the equipment come first.

2.2 formwork installation: ²  Do not hoist in strong wind and fog, and the hoisting shall be fixed stably; ²  Don’t rely on the outer frame for formwork erection, and don’t panic during tie operation.

Ø   In case of danger, calm down first; Rescue and report.

Welder: v   The compressed gas cylinder is explosion-proof and has great fire hazard due to electric shock.

High altitude operation basket operator 9.

Ø   In case of danger, calm down first; Rescue and report.

3.3 reinforcement binding: ²  The platform shall be bound for two meters, and the tie shall be used for high-altitude operation; ²  Do not climb the reinforcement framework, and scatter the stacked materials on the overhead.

Hoisting signal rigger 15.

Ø   In case of danger, calm down first; Rescue and report.

u   Management of compliance with regulations and discipline and participation in education and training; u   The contents of disclosure shall be kept in mind and problems shall be reported in case of hidden dangers.

Check the cause of abnormal power failure; ²  There are records of patrol every day, and it is not advisable to pull and connect without permission; ²  Power off maintenance shall be locked and supervised by special personnel to ensure safety; Ø   In case of danger, calm down first; Rescue and report.

Ø   In case of danger, calm down first; Rescue and report.

Excavator driver 16 Mixer driver 17, water and electricity installer 18, manual hole digging pile worker 19, painter 20, waterproof worker    2、 Doggerel 1.

²  Balcony edge safety belt, hat belt for climbing operation; ²  The materials shall be stacked neatly and the operation platform shall not be overloaded; ²  No bricks are piled on the edge of the floor, and no people stand on the newly built brick wall; ²  Do not cross up and down, and do not hammer bricks to the outside.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

3.1 reinforcement fabrication: ²  The reinforcement shall be straightened without walking, and the short and surplus materials shall be cleared in time; ²  Do not cut short materials, and the protective devices are complete and reliable.

²  Hazard prevention of edge opening and safety belt for high-altitude operation; ²  The vibrating equipment shall be protected against electric shock, and it shall be tested once before missing the guarantee; ²  Wear insulated shoes on your feet and do not touch the switch with wet hands; ²  No one shall stand when washing the pump pipe, and the distribution equipment shall be firmly fixed.

List of types of work 1.

Ø   If people are injured, stop bleeding first; If you fall high, don’t carry it.

Concrete worker 7.

  10.

Plasterer: v   Accidents often occur in climbing operations.

Tags:

Related Post

The Ministry of housing and urban rural development solicited public opinions on the notice on strengthening the planning and constructionThe Ministry of housing and urban rural development solicited public opinions on the notice on strengthening the planning and construction

(8) Improve the security capability. All localities should make overall plans for the construction of high-rise and super high-rise buildings in combination with the urban spatial pattern and functional layout.