The design team shall have a person in charge of Architecture (with a first-class registered architect qualification certificate and registered personnel of the organization) and a person in charge of structure (with a first-class registered structural engineer qualification certificate)( 2) If the legal person of the applicant institution is the same person or different institutions with direct holding relationship, it shall not register at the same time( 3) Consortium registration is allowed, and the number of consortium members shall not exceed 2

.

The organizer held a scheme deepening review meeting and finally selected the first, second and third place

.

If foreign design institutions or individuals cannot collect RMB, they can authorize domestic legal and independent legal persons to collect funds on their behalf( 2) The design institute shall have the right of authorship for the works to be applied for

.

It is planned to build a world-class urban public space and urban cultural height

.

The sponsor, the undertaker and the project construction unit can use all or part of the results of the scheme in the scheme adjustment and synthesis of the project, or modify them The undertaking unit and the project construction unit can also print, publish and exhibit all the results of the application, and evaluate, display and publicize the results of the application scheme through the media, professional magazines, books and periodicals or other forms( 3) The design scheme shall be original and not published in any form

.

The project leader has designed and completed at least one public building project with an area of more than 30000 square meters (including projects under construction and completed projects)

.

Located in the north section of Wuhan inner ring road, Wuhan simietang industrial building reconstruction project is an important part of the riverside core area on the South Bank of the Yangtze River in Wuhan

.

organizer: Wuhan planning preparation research and exhibition center contact information: + 86027-82719137 + 8615927332351 Ms

.

03 solicitation procedure the solicitation activity is divided into three stages: Open solicitation stage, conceptual design stage and scheme deepening stage( 1) At the stage of public solicitation, the candidate institution (or consortium) carries out conceptual proposal design

.

The project plot involves 6 key protected and reconstructed plants, with a construction area of about 15800 square meters

.

07 contact information organizer: Wuhan Urban Railway Construction Investment Development Co., Ltd

.

Yang + 8615623540639 Ms

.

In case of schedule adjustment, a separate announcement will be issued

.

It is also a key section of the Wuchang ecological and cultural corridor project

.

Project (accepted) consortium bidding.

.

If the project leader is inconsistent with the person submitting the application materials during the work, the organizer has the right to cancel his qualification( 5) The design organization promises to participate in the follow-up design work and improve the design content according to the requirements of the organizer, which is the premise of obtaining the shortlisted qualification and design fee

.

04 time arrangement the deadline for submission of concept proposal results is August 22

.

The specific schedule is as follows: August 6, 2021    Issue the solicitation announcement before 17:00 on August 22, 2021     The design organization submits the concept proposal results, and the registration deadline is August 25, 2021 (tentative)      Six design institutions were selected to enter the conceptual scheme design stage on August 27, 2021 (tentative)       Publish the list of 6 shortlisted design institutions, conceptual design stage September 3, 2021 (tentative)       Site survey and Q & A before 17:00 on September 23, 2021 (tentative)    Submission of conceptual scheme design results submission of conceptual scheme design results          Scheme design review meeting September 30, 2021 (tentative)      Publish the review results of scheme design conceptual design stage September 3, 2021 (tentative)       Site survey and Q & A before 17:00 on September 23, 2021 (tentative)    Submission of conceptual scheme design results submission of conceptual scheme design results          Scheme design review meeting September 30, 2021 (tentative)      Publish the scheme design review results note: the above time shall be subject to Beijing time

.

We are now open to excellent architectural design institutions at home and abroad to solicit the transformation design scheme of simietang industrial building in Wuhan

.

The sponsor, the undertaker and the project construction unit have the right to use the results of the scheme in the consultation of the project

.

The design scheme or any material used to create the candidate works shall not infringe any copyright, trademark right, patent right and other rights of a third party

.

2

.

06 solicitation description (I) the design fees of this solicitation are paid in RMB in China

.

After each shortlisted design institution submits the conceptual design results, the sponsor will hold a conceptual design review meeting, select the top three design institutions and enter the scheme deepening stage( 3) In the scheme deepening stage, the design organization shall submit the scheme deepening results as required

.

A review meeting will be held within one week to determine the shortlisted institutions; The conceptual design stage is initially determined from late August to late September; The scheme deepening stage is initially set for October

.

The registration requirements are as follows: (1) the design organization and project leader shall meet the following requirements: 1

.

3

.

02 registration requirements this solicitation adopts the method of public registration

.

Dong contact address: block a, Jianghua complex building, Jiang’an District, Wuhan City, Hubei Province contact email: whcsyjwl@163.com Co organizer: Wuhan Qiandai project construction bidding Address of bidding Agency Co., Ltd.: 16 / F, block a, Longyang Times Square, Longyang Avenue, Hanyang District contact person: Jindong contact information: 027-84766877 contract performance period: see the official text of the announcement for details

.

Consortium members shall not form other consortia with other design institutions alone or in other names( 4) The project leader shall participate in site survey and important node report

. Swift Lift Anchors

The Review Committee comprehensively reviewed the credit documents, concept proposals and other materials submitted by the applicant, and selected 6 design institutions to be shortlisted in the conceptual design stage( 2) In the conceptual design stage, the organizer organizes site survey and Q & A activities

.

The relevant matters are announced as follows: 01 project overview (I) project name: design scheme for reconstruction of industrial buildings in simietang, Wuhan (II) the project site is located in the bridgehead area of the Second Yangtze River Bridge, between Linjiang Avenue and Heping Avenue, Wuchang ecological and cultural corridor (under construction) in the west, simietang road and simietang primary and secondary schools in the north, simietang Park in the East and Xudong street in the south( 3) Project scale: the project covers an area of about 9.2 hectares; The total planned construction area is about 50000 square meters (determined according to the design scheme)

.

The first of the three design institutions selected in the scheme deepening stage can get another 700000 yuan (including tax) design fee, the second can get another 400000 yuan (including tax) design fee, and the third can get another 200000 yuan (including tax) design fee

.

Without the permission of the collector, the drawings or design results shall not be transferred to a third party or used for other projects outside the project( 5) All design institutions participating in this solicitation are deemed to recognize all terms of this announcement( 6) The laws and regulations applicable to the solicitation activity itself and the documents related to the activity are only the laws and regulations of the people’s Republic of China

.

05 design fee for the six design institutions shortlisted in the conceptual design stage, each can obtain 300000 yuan (including tax) design compensation

.

With the permission of the organizer, the design institute may evaluate and display the works to be applied for through the media, professional magazines, books and periodicals or other forms

.

In case of the above infringement, all disputes or legal liabilities arising therefrom shall be borne by the designer; Any loss caused to the organizer shall be compensated by the designer( 4) The design institute shall abide by the relevant confidentiality provisions of the state, properly keep the drawings and data provided by the collector, and protect its intellectual property rights

.

The design organization has designed and completed at least three public building projects (including built and under construction projects) with an area of more than 30000 square meters (excluding underground), and has designed and completed at least one construction and transformation project (including built and under construction projects)

.