Hefei landmark building is about to be demolished!


Due to the need of rapid transformation of Jinzhai Road in Hefei, the prosperous Avenue will pass through Jinzhai Road in the future

.

The elevated, ground and prosperous avenue of Jinzhai Road will form a “super intersection”

.

The landmark building “the first overpass of Pearl Square”, which has been accompanying Hefei citizens for 14 years, will soon be demolished

.

Let’s recall the time of a song

.

Click below to play the video

.

The Pearl Plaza overpass, known as “Hefei first Overpass”, was built in 2007 with a unique octagonal design

.

After reconstruction, the crossing mode will be changed from overpass mode to underground channel mode

.

Jinzhai Road (Ring Expressway Fangxing Avenue) rapid transformation project is divided into three sections: (1) widening transformation section: the widening transformation section of Jinzhai Road (Longchuan road high speed railway bridge) is elevated, and a pair of up and down ramps are added

.

(2) Ground expressway section: Jinzhai Road (high speed railway bridge – Ring Expressway) section adopts ground expressway

.

(3) Elevated expressway section: Jinzhai Road (Ring Expressway Fangxing Avenue) section adopts elevated expressway

.

The starting point of Jinzhai Road (Ring Expressway Fangxing Avenue) rapid reconstruction project is located at the intersection of Jinzhai Road and Longchuan road

.

The existing elevated Jinzhai Road is widened and reconstructed, and the ramp of upper and lower bridges is set to connect the ground

.

To the south, it successively passes Qianshan Road, high-speed railway bridge, expressway bridge, expressway interchange, Furong Road, Beihai Road, European style street, prosperous Avenue, Shimen Road, Danxia Road and Jinxiu road Avenue, Zipeng Road, Ziyun Road, Tangkou Road, the terminal is located in Fangxing Avenue Interchange

.

The total length is about 7.65km

.

There are 16 intersections in the whole line, and the ground floor is designed as level crossing

.

Among them, Fangxing Avenue is the current interchange

.

The main line of Fanhua Avenue, Jinxiu Avenue and Tangkou road is under Jinzhai Road

.

Jinxiu Avenue is a semi interchange

.

The auxiliary road at the intersection is level crossing with the ground level road of Jinzhai Road, and the other intersections are level crossing

.

At present, the work related to the rapid development of Jinzhai Road is advancing, and 908 new media will pay attention to it in time

.

Forwarding attention lights up the “watching” icon below, and more people see it.

.

Tags:

Related Post