Article 31 construction personnel shall take samples of test blocks, test pieces and relevant materials related to structural safety on site under the supervision of the construction unit or the project supervision unit, and send them to a quality testing unit with corresponding qualification level for testing

.

is dedicated, innovative, practical and dedicated.

.

[daily study] Article 29 the construction unit must inspect the building materials, building components and fittings, equipment and commercial concrete in accordance with the engineering design requirements, construction technical standards and contract agreements, and the inspection shall be recorded in writing and signed by a specially assigned person; Those that have not been inspected or fail to pass the inspection shall not be used

.

Article 33 the construction unit shall establish and improve the education and training system and strengthen the education and training of employees; Personnel who have not received education and training or fail to pass the examination shall not be allowed to work

.

Article 30 the construction unit must establish and improve the inspection system of construction quality, strictly manage the process, and make quality inspection and records of concealed works

.

Before concealed works are concealed, the construction unit shall notify the construction unit and the construction project quality supervision institution

.

Henan Daju Construction Engineering Co., Ltd

.

Article 32 the construction unit shall be responsible for repairing the construction projects with quality problems or those that fail to pass the completion acceptance

. Ring Clutch

Tags:

Related Post

The reconstructed building area is about 3.28 million square meters! Another batch of old residential reconstruction list in Harbin has beenThe reconstructed building area is about 3.28 million square meters! Another batch of old residential reconstruction list in Harbin has been

Another batch of old communities are about to be reconstructed. Is there your home this time? Nangang District 2022 old community reconstruction Harbin Nangang District 2022 old community reconstruction project