If there are general tax calculation projects in the future, can the input tax of this part of fixed assets still be deducted? 5 . Our company purchased materials last
Submission description video duration: within 10 minutes; Video size: priority is given to horizontal screen video; Video format: limited to MOV or MP4 format, resolution not less than 1080p; File
The prefabricated components of the project mainly include prefabricated columns, prefabricated beams, prefabricated stairs, prestressed double-T slabs, prefabricated composite slabs and prefabricated wallboards, with an assembly rate of 67%, which