Through the game between inside and outside, create an open space and invite people to experience the plant tourist education center from close and far away. The project is adjacent
Prefabricated building module is a well-known building method to achieve faster and more intelligent, focusing on quality and rapid assembly. It is also important to consider the approval process or
In addition to the above two projects, there are 14 red list projects, 7 black list projects and 4 rectification list projects in the current red and black list .