Because of what? The construction site in Wenchang has been exposed!


Click on the blue word “Wenchang Lagu” above to see more wonderful content source: Jining housing and Urban Rural Development Bureau, in order to comprehensively strengthen the dust control work of construction sites, strictly implement the main responsibility of enterprises and local supervision responsibility, unremittingly grasp the implementation of various measures to ensure the continuous improvement of air quality in Jining City The Municipal Bureau of housing and urban rural development continued to take the “four no two direct” approach to supervise and inspect the implementation of dust control measures at construction sites in the city, and strengthen the online inspection of the dust control and monitoring center at construction sites

.

Through the continuous development of a series of supervision and inspection activities such as “online monitoring” and “offline law enforcement”, six construction sites with serious problems, such as bid section 6 of inner ring viaduct project, upgrading and reconstruction project of north section of baoxiangsi road in Wenshang County, chunxiaoguantang in Yutai County, were reported and exposed, and the behaviors of the problem construction sites were included in the integrity integration platform

.

01 project name: inner ring viaduct project bid section 6 construction unit: Jining public Expressway Construction Co., Ltd

.

construction unit: China Railway 15th Bureau Group Co., Ltd

.

supervision unit: Shandong Qilu Urban Construction Management Co., Ltd

.

existing problems: large area of bare soil is not covered

.

02 project name: bid section 4 of inner ring viaduct project construction unit: Jining public Expressway Construction Co., Ltd

.

construction unit: China Railway 18th Bureau Group Co., Ltd

.

supervision unit: Jinan Construction Supervision Co., Ltd

.

existing problems: large area of bare soil is not covered 03 project name: North Section upgrading project of baoxiangsi Road in Wenshang County construction unit: Jining Wenhao Project Management Co., Ltd Construction unit: Weihao Construction Group Co., Ltd

.

supervision unit: Qingdao Municipal Supervision Consulting Co., Ltd

.

problems: 1

.

No dust suppression measures have been taken in earthwork construction; 2

.

Dust prone materials are not covered; 3

.

Bare soil of non working face is not covered

.

04 project name: Yutai County Chunxiao Guantang construction unit: Jining Huihong Real Estate Co., Ltd

.

construction unit: Jining Huiyuan construction and installation Co., Ltd

.

supervision unit: Yutai County Yong’an Engineering Supervision Co., Ltd

.

existing problems: 1

.

Failing to install β – ray PM10 dust on-line monitoring equipment as required; 2

.

Tire and body not washed clean with mud on the road before vehicles leave the construction site; 3 The bare soil of non construction operation is not covered or afforested; 4

.

Effective dust suppression measures are not taken for earthwork operation; 5

.

A large amount of dust is caused by vehicles passing the construction site; 6

.

There are floating soil and accumulated soil on the ground

.

05 project name: Jinxiang County Dongcheng hospital construction PPP project construction unit: Jinxiang North Urban Construction Development Co., Ltd

.

construction unit: Yanjian Group Co., Ltd

.

supervision unit: Shandong Qilu Urban Construction Management Co., Ltd

.

existing problems: 1

.

Main roads on the construction site are not hardened; 2

.

There are floating soil and accumulated soil on the ground; 3

.

Effective dust suppression measures are not taken for earthwork operation; 4 5

.

There are obvious damage, sanding and cracking on the hardened surface

.

06 project name: rongmaofu, Lvjun construction unit: Jinxiang Rongxin Real Estate Co., Ltd

.

construction unit: Jining Civil Construction Engineering Co., Ltd

.

supervision unit: Jinxiang Xingda Construction Engineering Supervision Co., Ltd

.

existing problems: 1

.

Effective dust suppression measures are not taken in earthwork operation; 2

.

Construction waste is not cleared in time; 3

.

Material stacking and processing site is not hardened

.