The total construction area exceeds 160000 M2! Let’s look at the planning and design scheme of the collection and resettlement housing project →


There is new news about the expropriation and resettlement housing project of plot d10b-04 in Chuansha new town

.

Main economic indicators: land area: 69876.2 square meters, total construction area: 163744.13 square meters, including aboveground construction area: 123552.61 square meters, underground construction area: 40191.52 square meters, floor area ratio: 1.70, building density: 18.08%, greening rate: 35.00% editor: Zou Ying*

.

Let’s take a look at the planning and design scheme ↓ construction project name of the expropriation and resettlement housing project of plot d10b-04 in Chuansha new town, Pudong New Area

.

Nature of construction land nature of three types of residential cluster land construction nature of residential construction details of the project: 16 13 ~ 15 storey residential buildings (relocation and resettlement houses), 1 complex building, 3 neighborhood stations, 1 switching station, 1 waste compression station, 1 waste room, 1 guard room and 1 underground motor vehicle depot (excluding capacity)

. Spherical Head Anchor

The construction land of the expropriation and resettlement housing project of plot d10b-04 in Chuansha new town, Pudong New Area is bounded by xiusha road in the south, Jinsha Road in the north, Jingsi road in the East and Jingwu road in the West

.

Tags:

Related Post

Lize “underground city” approved! The total underground building scale is about 500000 square meters! The total investment exceeds 7.1Lize “underground city” approved! The total underground building scale is about 500000 square meters! The total investment exceeds 7.1

Recently, the Fengtai District government website released the reply to the proposal for underground infrastructure and comprehensive development supporting projects in the North District of Beijing Lize financial and business