[Industry dynamics] Summary of policies related to construction solid waste in January and February 2023


(2) Build and utilize the disposal capacity system to implement the collaborative disposal of municipal sludge, industrial solid waste and construction waste residues by coal-fired power plants and domestic waste incineration institutions.

Timely revise and improve the application standards of building materials products for recycling construction waste.

For industrial development resource recycling projects, each district should dedicate at least 1% of its planned industrial land to the development of resource recycling enterprises.

By 2025, the discharge of construction waste (excluding engineering waste and engineering mud) at the construction site of new buildings will be no more than 300 tons per 10000 square meters, and the discharge of construction waste (excluding engineering waste and engineering mud) at the construction site of prefabricated buildings will be no more than 200 tons per 10000 square meters.

We will continue to promote the drying of the source of the project mud and the standardized digestion of the end.

Strengthen the management of construction waste transportation and realize the dust-free transportation of construction waste and the dynamic and intelligent supervision of the whole process.

02 Implementation Plan for the Construction of “Waste Free City” in Meishan City, Sichuan Province On January 31, 2023, the Meishan Municipal People’s Government issued the “Implementation Plan for the Construction of” Waste Free City “in Meishan City (MFF [2023] No.

Strengthen the classified collection and management of construction waste.

In principle, the responsible person system for construction waste management shall be implemented according to the principle of “who produces, who is responsible”, and the declaration system for construction waste discharge (generation) shall be established and improved.

Promote the delivery of full decoration to reduce the generation of construction waste at the construction site.

Construction, decoration, construction units and property service enterprises should establish a management system for the classified collection and stacking of construction waste, which should be collected and stacked according to the classification of engineering waste, recyclable metals, light materials, concrete, bricks and tiles, etc., and encourage the detailed classification of construction waste based on the end disposal, and dispose of construction waste according to the provisions of the competent department of urban appearance and environmental sanitation.

Promote the large-scale development of low-carbon buildings, fully implement the green building standards for new urban buildings, and promote ultra-low energy consumption buildings and near-zero carbon buildings.

Promote the full utilization of waste concrete in accordance with the principle of “market first and government support”.

Determine the emission limit of construction waste and establish corresponding incentive mechanism for projects with less or zero emissions.

Accelerate the reduction of construction waste at the source.

We will improve the government’s green procurement system and give priority to the procurement of recycled products.

Taking into account the amount and distribution of construction waste, transportation radius, environmental protection and other factors, the construction of construction waste resource utilization, consumption and disposal facilities should be reasonably arranged and planned according to local conditions.

By 2025, the recycling treatment capacity of house demolition and decoration waste in the city will reach 14.2 million tons/year, and the recycling treatment rate will reach about 75%.

Pressed Swivel Coupler

According to the principle of “building a foothold in the city and combining land and water”, improve the engineering earthwork consumption and utilization system, build projects such as Shanghai Modern Agricultural Industrial Park (Hengsha Xinzhou) as the comprehensive utilization and consumption site of municipal engineering earthwork, and increase the suburban engineering earthwork consumption space through ecological corridor construction, land consolidation and other ways.

Improve the construction waste recycling system.

Improve the construction waste reduction mechanism, strengthen the source control of construction waste, and effectively reduce the generation and discharge of construction waste during the construction process.

Vigorously develop prefabricated buildings.

We will improve the supporting policies for the recycling and utilization of construction waste and promote the use of building materials products that meet the standards for the recycling and utilization of construction waste.

We will promote the consumption and recycling of construction waste as a whole.

Encourage construction waste disposal enterprises to extend the industrial chain, participate in the whole process of construction waste collection and recycling in the demolition of construction projects, and promote the large-scale, efficient and integrated development of construction waste recycling.

The assembly rate of government-invested security houses, talent apartments and other residential building projects shall not be less than 40%, the assembly rate of public building projects shall not be less than 50%, the assembly rate of industrial projects shall not be less than 80%, and the assembly rate of real estate development projects shall not be less than 30%.

(3) Strengthen the guarantee of land use, include the solid waste classified collection, transfer storage, centralized utilization and disposal facilities into the scope of environmental infrastructure and public facilities, and ensure the use of land for facilities.

Promote the application of green building materials, increase the application of high-performance concrete, reduce the use of high-carbon building materials, promote green construction, and advocate green decoration.

It is not allowed to mix hazardous waste and domestic waste with construction waste, and it is not allowed to dump, scatter or stack construction waste at will.

3) (1) The construction goal is to establish a complete construction waste management system by 2025, with green buildings accounting for 100% of new urban civil buildings and prefabricated buildings accounting for 40% of new urban buildings, The recycling rate of construction waste in the central urban area shall not be less than 80%.

Promote green buildings and prefabricated buildings.

2) (1) to promote the full use of construction waste.

By 2025, the city’s construction waste recycling rate will reach about 93%.

1、 Local Dynamics 01 Shanghai Municipal “Waste Free City” Construction Work Plan On February 2, 2023, the General Office of the Shanghai Municipal People’s Government issued the “Shanghai Municipal” Waste Free City “Construction Work Plan (HFBF [2023] No.

Guide the reuse of construction waste at the construction site, promote the production of recycled aggregate and other building materials, road building materials and backfill utilization of construction waste, and promote the application of complex construction waste recycling into a set of processes and equipment.

(2) Implement whole-process management and promote standardized utilization and disposal of construction waste.

In accordance with the principle of “overall planning in the central urban area and self-consumption in the suburbs”, we will accelerate the optimization and reinforcement of the recycling treatment capacity of house demolition and decoration waste in the old port base and Pudong, Putuo, Jiading, Jinshan, Chongming, Songjiang and other districts.

By 2025, the construction waste recycling and utilization projects (waste disposal sites) in the Shigao urban planning built-up area of Meishan Tianfu New Area and the urban areas of all counties (districts) will be basically completed, and the urban construction waste recycling and utilization rate will not be less than 60%.
.

Tags:

Related Post

【 Scientific and Technological Achievements 】 Jiangsu Zhenjiang Institute of Building Sciences won the third prize of the “Huaxia Award” for【 Scientific and Technological Achievements 】 Jiangsu Zhenjiang Institute of Building Sciences won the third prize of the “Huaxia Award” for

This demonstrates the strong strength of the housing and construction system in scientific research and development, as well as the continuous enhancement of industry technology influence and core competitiveness. Source: