Xinjiang Architectural Design and Research Institute: the design of Urumqi Fangcang Hospital


45), and issue and implement the periodic support policy for housing provident fund.

Some designers take the initiative to hire cars and arrive at work early that day; Some are in a hurry and haven’t had time to prepare their toiletries.

The Engineering Survey Institute mobilized technicians, mechanical operators and drilling rigs to the site at the first time, carried out multi-party demonstration from the perspective of project quality, safety, economy, progress, etc., determined the foundation treatment design scheme and delivered the design drawings within 24 hours, and the on-site technicians solved the problems encountered in the construction in a timely manner.

Urumqi Shelter Hospital is positioned as a permanent shelter hospital, which is quite different from the isolation point transformation that the company has participated in before.

When they arrived at the post, they began to race against the clock, unite and cooperate, and entered a 24-hour “fighting” state of “white plus black”.

The First Institute of Mechanical and Electrical Engineering organized personnel from HVAC, water supply and drainage, and electrical disciplines to closely cooperate with the site construction, investigate the municipal supporting infrastructure data on the spot, carry out real-time linkage, and do a good job of reservation and embedment in advance.

So far, The payment of housing provident fund for 100 enterprises has been postponed for 158.443 million yuan.

Magnet Recess Former

The leaders of the company command from the front and actively coordinate the transportation of designers.

The management of the company participated in the whole process of scheme discussion, and the chief professional engineer did a good job of professional guidance.

It gathered more than 40 talented professionals from all disciplines to complete the survey and design drawings with high quality in the shortest time without giving up day and night, and contributed to winning the battle for epidemic prevention and control.

The designers learn and work day and night to design creatively, follow the principles of maximizing land use, rationalizing functional zoning, and humanizing space quality, and complete the design drawings with high quality..

After several sleepless nights, with the joint efforts of the design team, the geological survey report, design drawing of dynamic compaction foundation treatment, vertical design drawing, structural foundation drawing, material preparation drawing, building practice description and relevant drawings were delivered, which met the needs of on-site construction in advance and carried out the final sprint and drawing closure.

They went to the municipal epidemic prevention and control headquarters at the first time to understand the needs and accept the tasks.

We will step up efforts to help enterprises with housing provident fund, and help depositors and employees affected by the epidemic to tide over difficulties.

As of the end of August, 2651 projects had been started (resumed), with a commencement rate of 96.82%, a completed investment of 116.425 billion yuan and a completion rate of 52.49%.

The person in charge of the department of the First Architectural Design Institute was hospitalized the next day after receiving the task.

5001 housing provident fund loans that cannot be repaid normally due to the epidemic will not be overdue, and the loan balance involved is 1.232 billion yuan.

She and Gu were alone in the office to coordinate the work, quickly formed a team with rich experience in hospital design, and completed three design schemes within 24 hours for the municipal leaders and the leaders of the Health Commission to choose and make decisions.

Quickly organize the mobilization and deployment meeting, highlight the design focus, define the time node, divide the division of responsibilities, and require the attitude of “racing against the clock, taking the initiative”, and the style of “rigorous and meticulous, striving for perfection” to play a leading role in the housing and construction industry, and go all out to complete important tasks.

-Founded in 1984 – in charge | Ministry of Housing and Urban Rural Development – sponsored | Northeast China Institute of Engineering&China Survey and Design Association – Journal of the Architectural Branch of China Design Association.

In 2022, the whole Xinjiang housing and urban construction industry plans to invest more than 5 million yuan in 2738 projects, and plans to complete an annual investment of 251.7 billion yuan, an increase of about 15% year on year.

Among the more than 4900 municipal engineering projects of houses under construction in the district, more than 2600 projects have implemented closed management in accordance with the requirements of epidemic prevention and control, so as to ensure that the epidemic prevention and control are not lax, the construction site is not stopped, and the approval of engineering construction projects is “continuous” and the service is “continuous”.

Fully open the fire and be a good “vanguard”.

On August 10, the sudden epidemic situation made Urumqi press the pause button.

The residents of the autonomous region take the initiative and act quickly, actively participate in the anti epidemic volunteer service, enthusiastically solve problems for the masses, and with little by little efforts, convey the warmth of the truth.

The relevant staff of the company’s epidemic prevention and control leading group have been stationed for nearly 30 days.

The competent departments of municipal public utilities at all levels shall arrange and deploy the daily management and guarantee of municipal utilities such as urban water supply, gas supply, sewage treatment, garbage disposal and environmental disinfection as soon as possible, implement the spirit of the Notice on Implementing the Periodic Support Policy for Housing Provident Fund (JJ [2022] No.

The company’s party committee attached great importance to the task, bravely shouldered the design burden, and demonstrated the responsibility of state-owned enterprises.

Guided by technology, build a “wall of prevention and control”.

As a leading survey and design enterprise in the residential construction industry of the autonomous region, Xinjiang Architectural Design and Research Institute received the design task of Urumqi Shelter Hospital on the evening of August 31.

While ensuring that front-line personnel do a good job of protection, they have been working hard and actively coordinating to distribute snacks and snacks and provide living materials.

The main leaders of Xinjiang Architectural Design and Research Institute took the lead and personally supervised the work.

Up to now, 2545 projects have been approved, and 7635 service documents have been approved, accounting for 18.94% and 11.89% of the number of approvals in 2022, respectively.

Deploy quickly and sound the “assembly number”.

A total of 8338 employees who have paid for housing have withdrawn 107.4715 million yuan through online channels.

In the face of severe and complex epidemic prevention and control situation, the housing construction system of the autonomous region strives to overcome the impact of the epidemic, seize the “critical period” of construction, and fully promote the investment and construction of industrial projects.

Come up against the difficulties and rush to the “front line”.

Tags:

Related Post