With a total construction area of nearly 130000 square meters, Jiading plans to build rental housing here


Lifting Eye

project location: Anting Town, Jiading District, east to gupu River and west to Tingli road, To Keling road in the South and Deyou road in the north, the project has a total land area of 37215.60 square meters and a total construction area of 127977.6 square meters (total underground construction area of 34274.43 square meters), including 93039 square meters of aboveground capacity construction area and 831 motor parking spaces

.

For details, see ↓ project name

.

Economic and technical indicators correspondent: jiaxiaogui editor: Zhuo Mingxia pays attention according to the QR code  “ Shanghai Jiading wechat   Long press QR code to follow  “ Shanghai Jiading app  。

.

@Good news from my friends in Jiading

.

The construction scheme of the rental housing project in plots 03-01 and 04-01, inter city railway community, Anting Town, Jiading District has been publicized

.

The construction unit of the rental housing project in plots 03-01 and 04-01, inter city railway community, Anting Town, Jiading District, Shanghai jiazhuzhu rental operation Co., Ltd

.

Tags:

Related Post

The Ministry of housing and urban rural development plans to stipulate that all localities should strictly control the construction of newThe Ministry of housing and urban rural development plans to stipulate that all localities should strictly control the construction of new

    On September 10, the Ministry of housing and urban rural development issued the notice on strengthening the planning and construction management of super high-rise buildings (Draft for comments) on

Focus on carbon peak and carbon neutralization | people’s Daily: improving building energy efficiency and helping low-carbon developmentFocus on carbon peak and carbon neutralization | people’s Daily: improving building energy efficiency and helping low-carbon development

Moreover, energy-efficient doors and windows, high-performance concrete, high-strength steel and other building materials, and waterproof technology at the joints of prefabricated buildings all need stronger technical support to improve the