Suzhou Hotel collapsed, who is responsible for hotel construction safety?


Double Ended Ferrule

According to tianyancha information, Suzhou sijikaiyuan Catering Management Co., Ltd

.

Four seasons open source hotel rooms

.

At present, while comprehensively carrying out rescue, Jiangsu Province has organized in-depth investigation into the cause of the accident“ According to the notice issued by Suzhou, provinces and cities have held video and telephone conferences on existing construction safety management to learn lessons, draw inferences from one instance, strengthen safety production inspection and supervision, implement responsibilities and resolutely prevent similar incidents from happening again

.

The survey shows that in order to save money, the owner contracted the project to unqualified personnel for construction

.

A person in the hotel industry told the interface news that some domestic chain hotel groups will have higher requirements for hotel construction safety, and have professional teams to detect and reinforce the reconstructed property“ But many small hotels take chances, some even dangerous buildings

.

Recommended reading is prohibited without authorization

.

For the hotel industry, the first important thing is safety, followed by hygiene

.

Comments from hotel guests on OTA

.

It was built next to the hotel more than 10 years ago

.

188, Youche Road, Songlin Town, Wujiang District, Suzhou

.

The part on the safety of hotel construction is relatively general: “the material selection and structural design of hotel buildings shall meet the safety of use and the convenience of maintenance and cleaning”

.

was established in March 2020

.

” The Ministry of housing and urban rural development issued the code for design of hotel buildings, which was implemented on March 1, 2015

.

According to the on-site interviews of many media, the house of the hotel is old and construction is under way during the accident《 China Newsweek interviewed local people and learned that half of the four seasons open source hotel was a hotel, which was built more than 30 years ago, and the other half was a hotel, which was also part of the collapse

.

The incident hotel is located at No

.

on July 12, a hotel called “four seasons open source” in Suzhou, Jiangsu Province collapsed

.

Especially as the hotel industry enters the stock competition, it is not uncommon for operators to transform and operate Hotels with regional advantages“ There are three kinds of problems in old reconstruction projects: water leakage, fire safety and structural safety

.

The hidden dangers and risks caused by structural safety are great

.

” According to media reports, according to residents near sijikaiyuan hotel in Wujiang District, Suzhou, some hotels have covered floors and changed their accommodation rooms into chess and card rooms in recent years

.

The hotel is a heavy decoration business, which needs to introduce a large number of furniture, air conditioning equipment and bathing equipment

.

The picture is from the official photo album of Ota platform Hotel and the internal photos of the hotel

.

The safety factor of hotel buildings should be checked at least once every two years, especially during the decoration and transformation period

.

It is understood that the Ministry of housing and urban rural development is writing the construction standards for hotels

.

The local housing and construction department has never investigated and dealt with its long-term violations“ Hotel collapse accidents occurred one after another, indicating that the industry has not paid enough attention to the safety of the hotel

.

” Xia Zifan said

.

Before the four seasons open source hotel collapsed

.

The address of sijikaiyuan is a restaurant in public comments

.

To change a private room of 50 or 60 square meters into a hotel of 30 or 40 square meters, more partitions will be added“ I strongly opposed it at that time

.

A user comment in June 2020 said, “this was originally a mountain lake hotel, which was later changed to four seasons open source and is still in the trial operation period”

.

It is extremely dangerous to transform it into a hotel when the foundation is unstable

.

” She said that in the process of building the hotel, or in order to save design and construction costs, or due to the headstrong of design and operators, the self assertion of managers and the lack of early construction planning, hotel owners will bring hidden dangers to the construction safety of the hotel

.

According to media reports, the hotel used the names of Feiniu Hotel and Junyuan hotel until it opened the four seasons open source hotel last year

.

Hotel guests from OTA took Hotel facade photos

.

Xia Zifan, chief consultant of Lausanne Hotel Management Company, told the interface news that some old hotel reconstruction projects cause safety risks due to the lack of safety awareness and professionalism of hotel owners

.

The overall load-bearing will increase a lot

.

Ctrip’s introduction to the “four seasons open source” hotel shows that the hotel is located near Youche Road, Wujiang central pedestrian street, Yongkang Road Commercial Street, Yuantong Temple and Jingsi garden, with 54 guest rooms

.

On March 7, 2020, Quanzhou Xinjia Hotel, as the isolation point, collapsed, trapping 71 people and finally killing 29 people

.

The registration authority is Wujiang district market supervision and Administration Bureau

.

All preparations must be cautious

.

In May 2021, some guests commented that “it is said that the decoration will be upgraded”

.

The registered address of the company is the same as that of the hotel

.

The construction safety of the hotel has not been included in the industry specifications of the hotel industry, and the hotel construction still lacks corresponding standard management

.

According to the site report of interface news today, the hotel with three-story brick concrete structure has almost collapsed

.

According to Xia Zifan, at present, hotel buildings are approved according to the commercial building standards of the Ministry of construction, and the Ministry of housing and urban rural development has the code for hotel building design

.

The legal representative is Wang Anxin, with a registered capital of 500000 yuan

.

So far, 23 people have been trapped, 8 people have been killed and 9 people have lost contact

.

The collapse of hotel buildings also occurred last year

.

The business license projects include accommodation services, food business and catering services

.

” Zhao Huanyan, chief knowledge officer of Huamei hotel consultant, shared the evaluation and said, “from previous cases, it is a taboo to operate while decorating

.

Official photo reporter from OTA website|   Zheng Cuiying, at about 3:30 p.m

.

For example, she said, there was an old property transformation hotel project in a southern city, which was built on the beach at the entrance to the sea, and the industry mainly transformed the catering private rooms into hotels

.

In 2015, China’s Ministry of housing and urban rural development issued the notice on strengthening the use safety management of existing houses, pointing out that it is necessary to improve the subject responsibility awareness and public safety awareness of property owners and users, reduce acts that affect and damage the use safety of houses, and prohibit unauthorized changes in the main body and bearing structure of houses, changes in the use of balconies and other decoration acts, Effectively perform the obligations of house maintenance; It is necessary to urge the house property owner and the management service unit entrusted by him to strengthen the management of house use safety and strengthen daily inspection and supervision; Establish a daily inspection and maintenance system for house safety, regularly inspect house safety, and repair problems immediately

.

At the same time, some commented that “the hotel facilities are old” at the end of 2020

.

However, at present, domestic hotel construction units use more commercial building space in order to attract investment in the future, and very few are designated as special hotel buildings in the early stage

.

The investigation conclusion of the accident investigation team of the State Council shows that the major production safety responsibility accident was caused by illegal construction, reconstruction and reinforcement construction

.

In 2016, the owner illegally reconstructed the project, which exceeded the bearing range of the original structure and buried hidden dangers for building collapse

.

Tags:

Related Post