[supervision] Yixing construction site dust “red and black list” (18)


construction unit: Jiangsu Suzhong Construction Group Co., Ltd

.

reason for listing: flushing facilities are not in normal use; Bare soil is not covered; Dust reduction measures are not taken for materials prone to dust; Dust and mud accumulation on site roads; Dust control measures are not implemented in place

.

construction unit Nantong Huarong Construction Group Co., Ltd

.

In 2021, the Municipal Bureau of housing and urban rural development continued to publicize the “red and black list”

.

supervision unit: Nantong Tiejun Construction Supervision Consulting Service Co., Ltd

.

supervision unit Jiangsu Saihua Construction Supervision Co., Ltd

.

reason for listing: the guard management system is in place; The road is clean and tidy; Bare soil cover; Dust control measures have been implemented

. Bolt Anchor

Black list (II) project name Haiyi times square construction unit Yixing Haiyi Times Square Co., Ltd

.

and the supervision unit of Jiangsu Hongcheng Engineering Project Management Co., Ltd

.

reasons for listing: dust and mud accumulation on site roads; Bare soil is not covered; Dust reduction measures are not taken for materials prone to dust; The enclosure spray is not normally opened; Poor site appearance; Dust control measures are not implemented in place

.

Name of Red List Project: Yixing Dingshu Qinglongshan plot a project construction unit Yixing Baoming Real Estate Development Co., Ltd

.

List of rectification before and after rectification (I) project name: plot B-3 on the east of Wangpo River, Xinzhuang street construction unit: Yixing HENGJING Real Estate Development Co., Ltd

.

In order to fully implement the document spirit of the “red and black list” assessment measures for pollution prevention and control of construction sites in Yixing City, we will resolutely win the special attack of construction pollution prevention and control with the most stringent standards, rules and schemes, and maintain a normal and long-term effect

.

reasons for listing: the entrance and exit of the gate and the on-site roads are clean and tidy; Dust suppression equipment such as enclosure spray and fog gun are in normal use; Materials on site are stacked orderly; The site appearance is good; Dust control measures are in place

.

supervision unit Jiangsu Guangjing Engineering Project Management Co., Ltd

.

Shanghai Yunfeng Construction Co., Ltd

.

Black list (I) project name: plots south of Wanshi chating road and east of Wanyuan Road, Yixing City

.

construction unit Shanghai zhu’an Construction Development Co., Ltd

.

hope that all participating units of projects under construction will seriously implement various work requirements before and after rectification, and must pay great attention to the epidemic prevention and control of safe production and civilized construction (dust management and control) and strictly conduct self inspection and self correction to ensure the quality improvement of work throughout the year Junqing likes + is watching ↓↓.

.

(II) project name: phase II Construction unit of plot a on zhuhailing, Yixing Hongli Oriental Tourism The construction unit of real estate development Co., Ltd

.

supervision unit: Nantong Ruida Construction Supervision Co., Ltd

.

supervision unit Jiangsu Sanyi Construction Supervision Co., Ltd

.

construction unit Fujian hengqingda Construction Engineering Co., Ltd

.

construction unit: Zhejiang Haibin Construction Group Co., Ltd

.

Rectification Red List Project Name: integrated circuit industry carbon material application and development project construction unit Yixing haifeiling Electronic Technology Co., Ltd

.

Project construction unit: Wuxi Tian’an Hongzhi Real Estate Co., Ltd

.

Tags:

Related Post