[memory] architecture can be read: there is an old building on the Bund that once “won the championship” with the average floor height, do


Located at No.

The main work is to clean the exterior wall and remove the additives such as the external machine of the air conditioner, add residual iron parts after removing the wall surface, and sort out the exposed pipelines.

Because its house number is No.

Schematic diagram of the lighting scheme of the glass ceiling since the concrete floor slab added at the patio in the later stage makes it impossible to restore the natural lighting of the glass ceiling, the design adopts the LED lamp shooting at the arch reflective gypsum board above the ceiling at the inner arch foot of the ceiling, and uses the soft and homogeneous reflected light to simulate the natural lighting.

The walls around the hall are all buioni pilasters.

At the same time, the size of the enterprise nameplate is reduced, and the material is changed from high gloss to matte.

It is the longest clear water red brick building in Shanghai.

There are two Ionian columns through the second and third floors in the three bays in the middle, and the deformed Palladian motif is adopted in the middle span of the second floor.

It is now the office building of China Everbright Bank Shanghai Branch.

The two TASI dry columns at the main entrance and the Ionian columns through the second and third floors are made of polished Qingdao granite.

Address: No.

29, Zhongshan East 1st Road, this building is a 3-story steel reinforced concrete hybrid structure with a construction area of about 2200 square meters.

The entrance arch of the building clock in point 1 gate has a pair of TASS dry columns, and the lintel is a Greek lintel structure and a baroque scroll, which is exquisite and elegant.

The buildings on the Bund stretch meandering along the Huangpu River bank, row upon row, like solidified notes.

Historical photos of hall restoration on the first floor historical photos of hall restoration completion according to the historical photos, the original glass ceiling is in the form of cylindrical curved surface in the middle and spherical curved surface at both ends.

The East facade and the East span of the North-South facade of the building are decorated with granite, and the surface is rough cut, and the other facades are brushed stone.

It is worth mentioning that the building is 21.6 meters high.

99, Beijing East Road, Huangpu District opening hours: adjust 2 Asia building according to the business hours of merchants.

Asia building is square, calm, luxurious and elegant.

Among them, although the volume of one building is small, it has won the “first” among the buildings on the Bund (the average floor height is the first).

It is also one of the classical buildings with French baroque style characteristics on the Bund.

The six columns are divided into two columns, dividing the whole ceiling into three spans.

During the initial construction period, the bank business hall was in the center of the first floor, which was a large space supported by six Ionian columns.

The wooden doors, door covers, wooden parapets on the west wall and the marble floor with ceramic brocade brick palindromes have been restored.

The plane is a long strip, with a total length of about 123 meters in the east-west direction and a total width of about 19 meters in the north-south direction.

Schematic diagram of composite HVAC scheme for equipment renewal according to the space characteristics of tall buildings, the hall adopts a composite HVAC scheme.

2.

The interior wood decoration is teak, with Baroque decoration style.

It is Western-style.

1, Zhongshan East 1st Road, and it is also the southernmost starting point of the Bund building complex, it is called “Bund 1st building”.

Solid Lifting Socket Cross Pin

Although the building is not significant in volume and scale, it plays an important role in the modern architectural history of Shanghai and even the whole country.

In the hall, a circle of exquisite teak low counters are arranged along the columns, and rectangular teak plinths are set at the bottom of the six columns, which are integrated with the counters.

The beams interwoven between the left and right spans form a well shaped ceiling, with exquisite moldings and dense toothed decorations.

Under the windows on the north and south sides of the hall, there is a floor cabinet type multi connected air conditioner, and the refrigerant pipeline is laid under the wooden floor along the wall, and the wooden floor cabinet concealed air conditioner is made in combination with the windowsill and window sleeve; In the middle of the hall, in addition to the air-conditioning boxes and air supply at both sides of the ceiling, the floor thermal radiation is also set under the marble floor as auxiliary heating to solve the problem of the temperature gradient formed by the heating up and cooling down in winter.

3.

The construction personnel use the method of photo measurement, combined with the software to establish the ceiling model with different arch heights and radii, take the historical drawings and photos as the basis, take the same viewpoint and angle to generate two-dimensional pictures, analyze, compare and study, and finally determine the basic elements such as the span, radian, arch height and structure of the glass ceiling.

The restoration of wooden doors in the hall refers to historical materials and the only remaining baroque style tall wooden door covers on the east wall.

The doors and windows of the main entrance on the first floor are visually enhanced, and two TASI dry-type columns are used to support the architrave, eaves and semicircular arch wall.

Cleaning and repair of the facade the facade of the building after the repair is in good condition as a whole.

It is a brick wood mixed structure with 5 floors above the ground.

2、 The third floor was originally the staff apartment, which was arranged in a “back” shape, with a lighting patio in the center to provide natural lighting for the apartment, and a glass ceiling on the first floor to provide natural lighting for the business hall.

The arch wall is processed into a niche to set off the curly broken mountain flowers sitting on the architrave, and the spandrels on both sides are equipped with curved shield decoration.

The protection and repair project of building repair, which began in 2010, has protected and repaired the key protected parts of the building, such as the external facade and indoor hall, restored the style of the historical building, and endowed the era characteristics of the historical building through equipment renewal.

Although it has only three floors, the average floor height is more than 7 meters, which makes it the highest average floor height of buildings on the Bund at that time.

Now the Asiatic building has become Jiushi International Art Center, a brand-new art landmark..

The midspan is covered with an arched glass ceiling with an oblong plane, which is built by fine arch ribs and partially decorated with exquisite decorations.

1.

The East facade of the building is the main facade, which is composed of horizontal and vertical three sections, and the proportion is rigorous.

Peripheral clock in point 1 Yifeng building (Yifeng · thebund source) Yifeng building was designed in 1906 and completed in 1911.

It was designed in 1912 and completed in 1914.

It is a neoclassical style building with Baroque decoration.

The interior decoration of the building is also quite distinctive.

Today, let’s learn about its story together ↓ historical photos of the building itself.

Redesign and install floodlights.