[jianjiantong] the supervisor was fined 5000 yuan for taking the post after drinking


and cleared the site for supervisor Zou.

imposed a fine of 5000 yuan on Shandong Jingye Construction Project Management Co., Ltd.

The staff of our Bureau ordered the supervision company to stop the supervisor and give a warning to the dedicated supervision company.

Prop Shuttering

Subsequently, the construction unit Linqing zhongyuncheng Development Co., Ltd.

Jianzhong001 source: Linqing Comprehensive Administrative Law Enforcement Bureau on September 17, during the functional supervision of the construction site under construction, the Municipal Comprehensive Administrative Law Enforcement Bureau inspected the construction section of the heating project to Xinglin Road (Datang road Yinhe Road).

In order to better control the quality and safety of the project, the law enforcement personnel of our bureau strengthen the functional supervision of each project, inspect in strict accordance with the rules and regulations, resolutely be meticulous, take the project quality as the core, take the normative requirements as the standard, and pay close attention to the key parts affecting the project quality, Prevent and eliminate all kinds of quality and safety hazards, and promote the construction of key projects of our bureau with high standards, high quality and high efficiency.

Quality and safety are the life and soul of the project.

(source: integrated on the Internet, the picture and copyright belong to the original author.

If there is any infringement, please contact to delete!) long press the QR code to follow us   ▶▶▶。.

It was found that the supervisors appointed by the dedicated supervision company drank alcohol during working hours and took up their posts after drinking, and their awareness of safety production was weak, Violation of national laws and regulations related to work safety and relevant management systems.

Tags:

Related Post

Inspection lot → subdivisional → divisional → unit: how to organize and implement the acceptance of construction projects at all levels?Inspection lot → subdivisional → divisional → unit: how to organize and implement the acceptance of construction projects at all levels?

The construction project is divided into “inspection lot → subdivisional works → divisional works → unit works” and the method of gradual acceptance has been adopted and standardized by the

The Municipal Housing and Urban Rural Development Bureau conducts a special inspection on flood prevention and safety at construction sitesThe Municipal Housing and Urban Rural Development Bureau conducts a special inspection on flood prevention and safety at construction sites

They urged the project department to increase the inspection of the fixed condition of the lifting machinery equipment foundation, improve the equipment’s wind and rain resistance Provide lightning protection and