The construction project is divided into “inspection lot → subdivisional works → divisional works → unit works” and the method of gradual acceptance has been adopted and standardized by the
At present, the company has more than 20 projects under construction, mainly concentrated in Sichuan and Chongqing, mostly super large complexes and landmark buildings, It also includes two major infrastructure
Watching the injured steel bar pass through the intestines, each medical staff present took a breath of cold air . ▲ before the operation, the injured person was clearly conscious