Hainan construction enterprises pay attention! Notice on Dynamic Verification of Construction Enterprises and Supervision Enterprises in


Enterprises entering Hainan from outside the province that carry out business activities in our province shall be subject to dynamic verification of market behavior by our department and the competent housing and urban and rural construction administrative departments of all cities and counties as required.

For other professional contracting enterprises without registered personnel requirements, on-site verification can be carried out in combination with the actual situation.

(2) Market behavior verification (refer to Appendix 2 for procedures and contents) The competent departments of urban and rural housing construction in all cities and counties shall, in accordance with the principle of “double random, one open”, and in combination with the situation that the project is listed as a key verification object, determine to carry out enterprise market behavior verification for the project.

Relevant matters are hereby notified as follows: 1.

If the enterprises entering Hainan from outside the province have any of the circumstances listed in the previous article, we will send a letter to the qualification approval authority to suggest that they carry out qualification verification.

The housing and urban and rural construction bureaus of cities, counties and autonomous counties, the land planning and construction bureaus of Yangpu Economic Development Zone, relevant parks and enterprises: In order to further strengthen the post supervision of the qualification examination and approval of construction enterprises and supervision enterprises, standardize the order of the construction market, and improve the entry and exit mechanism of the construction market, according to the Administrative Provisions on the Qualification of Construction Enterprises (Decree No.

In case of any of the following circumstances, the above-mentioned enterprises conducting business activities in our province will be listed as the key verification objects: (1) More than two major quality safety accidents or more than two general quality safety accidents have occurred within one year; (2) Having bid rigging, collusion, fraud, participation in bidding, subcontracting, illegal subcontracting, qualification attachment and other bad behaviors; (3) If the enterprise’s credit rating is D or listed in the credit blacklist, the credit rating is C and the bidding frequency is abnormally high; (4) Failing to meet the safety production conditions required by the safety production license; (5) Practicing fraud when applying for qualification; (6) The company’s main personnel (including technical director, registered practitioners, personnel with professional titles, technicians, etc.) change their work units or change their social security abnormally; (7) Those who are listed as the key dynamic supervision objects due to their “certificate hanging” violations; (8) The wage arrears of migrant workers exist; (9) Failing to strictly implement the real name system management of construction workers (including key posts); (10) Enterprises that do not cooperate with supervision and inspection; (11) Having other bad behaviors that cause serious consequences or social impact.

When our department and the competent departments of urban and rural housing construction in cities and counties think it is necessary, they will go to the office site of the enterprise or ask the enterprise to go to the designated place to conduct on-site verification of the enterprise’s qualifications.

22 of the Ministry of Housing and Urban Rural Development) According to the relevant requirements of the Guiding Opinions on Strengthening the Dynamic Supervision of the Qualification of the Construction Market and Improving the Enterprise and Personnel Access and Clearance System (JS (2010) No.

The cities and counties shall further publicize and implement the Regulations on the Administration of the Qualification of Construction Enterprises (Decree No.

(4) From the date of issuance of this Notice, relevant enterprises shall check whether they still meet the qualification standards after obtaining the construction enterprise qualification certificate item by item against the verification requirements, and rectify immediately if they cannot meet the requirements..

General construction contractors, professional contractors (except for ready mixed concrete enterprises, the same below) and supervision enterprises whose business activities are carried out in our province.

The local housing construction departments should attach great importance to the dynamic verification work, fully understand the significance of the dynamic verification work, make careful arrangements, and carefully organize to improve the quality of the dynamic verification work.

In the process of verification, it is necessary to strictly implement various integrity regulations, comply with confidentiality requirements, and seriously investigate the responsibility of relevant responsible units and personnel for those who do not perform their duties according to law or do not act or act in violation of legal authority and procedures.

128), our department decided to carry out the dynamic verification of construction enterprises and supervision enterprises in 2022.

2、 The general contracting enterprises, professional contracting enterprises and supervision enterprises registered in our province with the authority of verification shall be subject to the dynamic verification of enterprise qualifications and market behavior by our department and the competent housing and urban and rural construction departments of cities and counties (including parks) according to their respective approval authority.

(3) Strengthen publicity and training.

The verification of construction enterprises and supervision enterprises adopts a combination of enterprise self inspection, online verification and on-site verification, focusing on online verification, and on-site verification if necessary.

In combination with the requirements of this Notice, the local implementation plan shall be formulated, and the Summary of Qualification Dynamic Verification Conclusions and Handling Opinions of Construction Enterprises and Supervision Enterprises in 2022 (Appendix 5) shall be submitted to our department within 10 days after the end of each quarter.

159) and other laws, regulations and normative documents for the construction enterprises and supervision enterprises that carry out business activities within their jurisdiction, so as to help enterprises understand the spirit of the documents.

Our department will supervise and spot check the verification work at the city/county level in combination with relevant work.

Lifting Socket

4、 Work requirements (I) Strengthen organization and leadership.

The enterprises implementing online verification shall be selected according to the principle of “double random, one open”, with at least 10 provincial-level enterprises per quarter (including at least 3 supervision enterprises); Each city/county (park) shall be determined according to 5% – 10% of the number of enterprises that have completed the post qualification verification.

2.

Online verification is to compare whether the number of registered practitioners of the enterprise meets the configuration requirements specified in the qualification standards based on the information of the enterprise related information system; Whether the registration time of enterprise registered practitioners is consistent with the social insurance payment records (including those outside the province).

Our department will track, supervise and provide services for the inspection work at the city and county level.

3、 Verification method (I) Qualification verification (refer to Appendix 1 for procedures and contents) 1.

Our department will supervise and spot check the inspection work of cities and counties in combination with relevant work.

(2) Standardize the verification behavior.

The quarterly inspection items of each city and county shall not be less than 5% – 10% of the total number of items.

22 of the Ministry of Housing and Urban Rural Development), the Qualification Standards for Construction Enterprises (JS [2014] No.