Fujian construction enterprise credit evaluation system construction output value reporting period extended to March 31 (with operation process))


In normal Fujian construction enterprise credit evaluation system, the construction output value of “housing construction” of construction enterprises in Fujian Province is generally reported by the credit evaluation system in January every year, The “municipal” construction output value of construction enterprises in Fujian Province and the “housing construction” (municipal) construction output value of construction enterprises outside Fujian Province should be declared in the “Fujian project construction supervision information system”, and the credit evaluation system will automatically collect from the project supervision system

.

After completing the electronic signature, the enterprise can click the “report” button in the upper right corner to complete the report of construction output value..

.

With the general contracting qualification of construction engineering, it is necessary to add and fill in the construction output value of housing construction

.

4、 After the completion of the electronic signature, click the “upload save” button to upload and save the signature file, that is to complete the electronic signature

.

The construction output value reported by the enterprises in the province is the total output value of the construction industry (the output value data shall be consistent with the total output value data of the construction industry reported to the statistical department), and the unit is “thousand yuan”

.

3、 Enterprises with general contracting qualification of construction engineering select “housing construction” in “construction output value type” of construction output value information interface

.

The filling process is as follows: 1 http://220.160.52.164 :98/zjxypj/zjxypjform/homepage/ homepage.aspx Two, click on the “enterprise login entrance” in the upper right corner, use the CA lock to login system, and on the right side of the list of construction output values, click on the “new” (please pay attention to the official account number) button to carry out the construction output value

.

Recently, the Provincial Department informed that the filling of output value should be postponed to March 31, 2021

.

After filling in the construction output value, click the “save” button (please pay attention to the building qualification person’s official account) and submit it to the statistical department’s corresponding annual statistical report

.

Standard for bonus points of construction output value: according to the accumulated construction output value of the enterprise in the previous year (housing construction general contracting and municipal general contracting): the full score is 10 points; if there is no construction output value or the construction output value is not reported, 0 point; if the construction output value is less than 100 million yuan, 3 points; if the construction output value is less than 100 million yuan, 4 points; if the construction output value is less than 500 million yuan, 5 points; if the construction output value is less than 1 billion yuan, 5 points 6 points will be given if it is more than 2 billion yuan, and 1 point will be added for every additional 2 billion yuan

.

January is in a hurry, so many enterprises often forget to fill in

.

Tags:

Related Post