Embedded technology of building hydropower [systematic course]


Course content is divided into three parts: the first part: positioning 1, self positioning (can know their position on the site, what position on the drawing) 2, equipment positioning (can know how to accurately position the distribution cabinet, bridge, line pipe, line box, bushing, grounding welding, etc

.

on the drawing) the second part: construction preparation 1, know what should be prepared before the project starts What? 2

.

Know what to pay attention to when making these things? Part 3: on site operation

.

1

.

Know how to carry out on-site actual construction operation according to the requirements of drawings and specification atlas

.

2

.

Know what must be carried out on-site construction according to drawings and specification atlas

.

Which drawings and specification Atlas have no requirements and need to carry out on-site construction according to their own experience

.

Course content explanation stage and Specialty: explanation stage: from the beginning of the foundation to the end of the main completion of the secondary distribution

.

Explanation Specialty: 1

.

Strong and weak electricity reservation and embedding technology 2

.

Lightning protection and grounding reservation and embedding technology 3

.

Water supply and drainage reservation and embedding technology 4

.

Civil air defense, hydropower and ventilation reservation and embedding technology

.

Course participants: 1

.

Personnel who have just graduated and entered the hydropower installation industry (theory without practice, not familiar with the site, not understanding the specification) 2

.

Personnel of hydropower installation industry with less than three years’ experience (Party A, supervisor and construction personnel who need to be systematically promoted in the site with unsystematic practice and experience) 3

.

Guerrilla troops turn into regular army (it’s no problem to work on the site at ordinary times, but it’s necessary to talk about the requirements of the specification atlas I don’t know what to do) 4

.

Personnel who want to switch to the hydropower installation industry (the systematic training can help you quickly get familiar with the on-site construction in the industry) course effectiveness: course expiration date October 16, 2025 (during this period, the course can be learned repeatedly) the following is the course directory (there will be updates later) Chapter 1: building electrical site positioning No.1 Section 4: how to determine your site position? Section 2: how to determine the installation position of water blocking steel plate? Section 3: how to install the wall panel box and distribution box section 4: how to determine the installation position of the top panel box and distribution box? Section 5: how to determine the installation position of the down turn pipe and up turn pipe? Chapter 2: preparation for building electrical embedded construction section 1: key points and precautions for on-site fabrication of water resisting steel plate section 2: key points and precautions for on-site fabrication of wire box reinforcement section 3: key points and precautions for on-site fabrication of wall panel wire box section 4: key points and precautions for on-site fabrication of roof wire box section 5: key points and precautions for on-site fabrication of bridge opening section 6: indoor power distribution Key points and precautions for on-site production of box opening section 7: key points and precautions for on-site production of hopper Chapter 3: on site operation of embedded wall panel box and distribution box section 1: on-site operation of embedded wall panel box distribution box section 2: on-site operation of accurate positioning of wall panel box distribution box section 3: on-site operation of wall panel box distribution box to improve sticking rate section 4: wall panel pipe and roof Line pipe connection field operation Chapter 4: roof box, distribution box and bridge hole embedded field operation section 1: roof box line pipe installation field operation section 2: roof up pipe laying field operation section 3: roof down pipe laying field operation section 4: roof bridge hole reserved field operation section 5: finishing work after roof surface construction Chapter 5: aluminum membrane plate pre installation Embedded field operation section 1: [aluminum mold] wall panel wire box distribution box installation field operation section 2: [aluminum mold] top panel wire box distribution box bridge hole installation field operation Chapter 6: laminated plate embedded field operation section 1: laminated plate top panel wire box wire pipe embedded field operation Chapter 7: wire pipe correction protection and dredging field operation section 1: top panel pipe up correction protection field operation Section 2: on site operation of pipe dredging and threading section 8: on site operation of secondary piping section 1: on site operation of post wall marking and slotting section 2: on site operation of post wall stabilizing box piping section 3: on site operation of post wall slotting free installation of pipe, box and distribution box section 4: on site operation of post wall distribution box installation chapter 9: on site operation of lightning protection and grounding section 1: congda Explanation of the process from pile to raft column section 2: practical operation of Pile Foundation Grounding section 3: practical operation of Foundation Grounding section 4: practical operation of lightning protection down lead section 5: practical operation of lightning protection test point section 6: practical operation of total equipotential section 7: practical operation of toilet local equipotential section 8: practical operation of JDG pipe, welded pipe and galvanized pipe grounding jumper section 10 : site positioning of building water supply and drainage section 1: how to determine the site installation position of wallboard casing section 2: how to determine the site installation position of roof casing section 11: construction preparation of building water supply and drainage embedded section 1: key points and precautions of casing field production Chapter 12: field operation of building water supply and drainage embedded section 1: field operation of waterproof casing embedded section 2: common casing This course focuses on the training of 100 people this year, so we add a one-year live teaching method: Tengyun classroom recording + QQ group live broadcasting + Live Broadcasting (this year, I am on-site supervision, and I am also on the construction site, so I can do direct teaching on site (broadcast) now 50% off the training fee for 100 students: the original price is 1396, but now it only costs 698 yuan

.

At present, 78 people have signed up, and there are 22 places to sign up

.

Contact Zhougong wechat: azpt9911.

.

Tags:

Related Post

The company won the second prize of building information model (BIM) application competition group in Shandong “Prospering Shandong”The company won the second prize of building information model (BIM) application competition group in Shandong “Prospering Shandong”

Cast In Loop Good news , on December 23, the first Shandong construction industry building information model (BIM) application competition – “China Construction Bayi Cup”, a vocational skill competition of