Design consultation, construction, material selection, training and phi certification of passive low energy consumption building project


The air tightness of the building is less than 0.6 times (the air exchange rate is less than 0.6 times per hour under the indoor and outdoor 50pA pressure difference).

2.

Plate Rebar Anchor

H person; the indoor carbon dioxide content is less than 1000ppm; and the raw air The demand for live hot water is 60 ℃; 25L / person / day; Condensation water and mildew shall not appear on the indoor surface.

Excellent air tightness.

Good performance of passive house Location: 1 More than 92% energy saving: the annual living electricity and heating cost of 100 square meters of passive houses is about 1781.2-2671.80 (the first grade civil electricity price in Beijing is 0.488; the annual heating cost of ordinary houses is 30.00/m2).

The indoor is extremely clean, and the cleaning cycle and degree will be greatly reduced..

15-4.25; Project content: foundation, main body, thermal insulation, doors and windows, fresh air system and interior decoration; General contractor: Beijing Sunshine Shida Construction Technology Co., Ltd; Technical director: giant expert in passive housing; Construction Supervision: Phi certified constructor of German passive Housing Research Institute; Parts and components: doors and windows, fresh air system, air tight tape, thermal insulation materials and other parts that have obtained the recent certification certificate of phi or relevant national testing institutions; Project quality acceptance: Phi constructor and giant experts in passive housing; Service life of the building: 70 years.

High comfort: the indoor temperature is 20-26 degrees, the surface temperature of all sides of the enclosed room is not lower than the indoor temperature of 3 degrees; the air relative humidity is 40-60%; the indoor air flow rate is less than 0.2m/s; the noise is less than 35 dB; the air exchange rate is 20-30 m3.

Construction time of passive low energy consumption buildings for self built houses of rural houses in Beijing: September 2021 16-12.31; Project content: foundation, main body, thermal insulation, doors and windows, fresh air system and interior decoration; General contractor: Beijing Sunshine Shida Construction Technology Co., Ltd; Technical director: giant expert of China Building Energy Conservation Association; Construction Supervision: Phi certified constructor of German passive Housing Research Institute; Parts and components: doors and windows, fresh air system, air tight tape, thermal insulation materials and other parts that have obtained the recent certification certificate of phi or relevant national testing institutions; Project quality acceptance: Phi constructor and giant experts in passive housing; Service life of the building: 70 years.

4.

Because the fresh air system continuously delivers filtered fresh air to the room, the amount of oxygen is extremely sufficient and the turbid gas is eliminated, it can greatly improve people’s quality of life, is particularly beneficial to people’s physical and mental health, and is very suitable for the living of the elderly, children and pregnant women; The green plants and flowers in the passive room grow vigorously, and the fish jump around happily; It has great improvement for patients with chronic pharyngitis and rhinitis.

Architectural design description II.

Architectural Design Description: Passive House (called near zero energy consumption building or passive ultra-low energy consumption building in China) is a kind of building that only uses passive technologies such as efficient thermal insulation peripheral protection structure, too much heat energy and building internal heat gain, and fresh air equipment with heat recovery factor of more than 75%, instead of active heating equipment, so as to realize that the building can meet the indoor comfortable temperature range required by the specification throughout the year.

1、 Construction time of self built passive houses for rural houses in Beijing: October 2021 12-11.22,2022.03.

3.

Tags:

Related Post