Construction Technology | another group company of central construction enterprise was established!


If the original copyright owner disagrees.

We should build a new system and present a new atmosphere; We should wear new shoes and take a new road, turn our head and body together, realize “integration, reconstruction, integration and improvement” as soon as possible, and make a new start.

The morning of December 26th, the founding ceremony and the unveiling ceremony of China Electric Power New Energy Group Co., Ltd.

The second is to achieve accurate positioning.

First, we should realize the “three fast”.

The leaders of China Power Construction Corporation stressed that the company should take the formal establishment of power construction new energy group as an opportunity to further unify their thinking, improve their position, make concerted efforts and work hard to promote the power construction new energy cause to open a new journey, achieve new achievements and reach a new level.

The copyright belongs to the original author and the original source.

It undertakes the glorious mission and major responsibility of helping China power construction strategic transformation and high-quality development.

Third, we should innovate the system and mechanism.

/ / official account official of WeChat / NOCITCE / WeChat changed the push rule because of the official account of WeChat.

The yellow star is the same as the Android official account.

Fixing Socket

We should conscientiously implement the mission and responsibility entrusted to PowerChina new energy group by the group, accelerate the construction of a domestic first-class new energy investment and operation platform with unique market development ability, good operation and management level and high quality and benefit contribution, and give full play to the investment and construction integration advantages of PowerChina in the field of new energy, Combine the advantages of the industrial chain with the standardized and digital construction management mode and intelligent operation mode, build a leading enterprise and leading enterprise in the new energy development and construction industry, and launch the brand of “China power construction new energy”.

After the establishment of PowerChina new energy group, the installed capacity of new energy has exceeded 7 million kilowatts, marking that the development of PowerChina new energy business has entered a new stage and reached a new height.

Source: Super building.

Star setting: enter the official account homepage and click on the top right corner.

To make a “running start” with the struggle attitude of starting and sprinting, leaders and managers at all levels must quickly enter the working state, safe production and operation development must quickly enter the right track, and the contribution and supporting role to the reform and development of China’s power construction must quickly appear.

were held in Beijing.

If you do not want to miss the highlight of this official account, please set the public address of the construction technology as the star sign and click “collect”, “look at” and “Zan” at the end of the text, so that each new article will appear in the subscription list at the first time.

It is understood that the implementation of the group’s new energy business restructuring, PowerChina implements the new development concept, seizes the historic opportunity of new energy, adjusts the business structure, and realizes the major strategic deployment of the group’s transformation from construction oriented to “investment, construction and operation” integration.

The official announcement was held in December 26th.

Forenoon, the yellow star is the star symbol.

We should integrate resources, optimize allocation and give full play to the effect of reorganization; Reengineer the management process, innovate the system and mechanism, and realize intensive management; Integrate ideas and culture, establish common values and gather majestic forces; Improve the efficiency level, strengthen risk control and achieve high-quality development.

Tags:

Related Post

Shenzhen Recruitment | BIYI Architectural Design – Senior Architect/Intermediate Architect/Junior Architect/Interior Designer/ArchitectureShenzhen Recruitment | BIYI Architectural Design – Senior Architect/Intermediate Architect/Junior Architect/Interior Designer/Architecture

The company introduces Mr. The concept of sustainable development and ecological energy conservation 3. Eberler developed three important design ideas from the perspective of late modernism architectural theory and incorporated