Architecture strategy | believe me, this is not just a map!


Students can study by themselves in the experimental building.

Save this school map and let me introduce it to you one by one.

It is the longest integrated teaching building in Asia.

Ja-111 is the largest multimedia classroom in the school, often holding various parties and competitions.

The collection includes books in more than 20 languages, including Chinese, English, Russian, Japanese, German, Italian, French, Korean, Albanian and Portuguese, with a total of more than 3 million copies and more than 1380 newspapers and periodicals in Chinese and foreign languages.

There is an automatic laundry room on the first floor of each building, and shoe washers on 2c, 5b and 6B.

Each area is connected and can be freely crossed.

5 for boys and the rest for girls.

Photography / fan Zhenggang aerial photography of Sinology College / Hu Yang experimental building of art college is located in the south of the school.

The museum is quiet, cool and comfortable, which is a good place for learning.

Xiaomeng newcomers may not be familiar with the school environment when they first enter Xiwai.

From east to west, it is divided into buildings 1-6, 123 into three blocks ABC and 456 into two blocks ab.

Not long ago, self-service coffee machines and vending machines were newly installed in the teaching building.

All the experimental buildings are multimedia classrooms with air conditioning.

The library “electric rice cooker”, a standard building in Xiwai, is the fastest place in the campus network of the school, with six floors.

Before use.

The first floor of each building is equipped with bathrooms, with No.

1A can deal with circuit problems on the first floor, and 2b has a school infirmary on the first floor, which is open all night after 7 p.m.

Each floor is equipped with water dispensers.

The opening hours are from 9:00 to 22:30 every day.

The fixed classrooms of freshmen and the offices of colleges are here, and water dispensers are set on each floor.

Ha, school is about to start.

Of course, there was also a leisure area for everyone to relax after class.

it is divided into nine areas, abcdefghi.

4A there is a repair booth downstairs, which can be equipped with keys, shoes, etc.

And it will be upgraded soon, adding cafes, conference halls and other places.

Mr.

Loop Box

It starts with S and is divided into ABCD four areas.

Please look forward to it.

02 little surprise photography in life / 2017 Yingji Gaochang dormitory building is a place to eat, sleep, learn to play games and watch plays.

There are computer rooms and voice laboratories in the building.

social union can’t wait to see you.

The bathroom is fully equipped with independent compartments.

You need to apply for a bath card in bathroom 4 first.

01 learning makes me happy school teaching building is located in the southeast of the school, starting with J.

Since the ratio of male to female is obvious in Xiwai, the first and third floors of the experimental building are male and female toilets, and the second and fourth floors are female toilets.

the balcony is closed and equipped with a private bathroom.

Tags:

Related Post

The Department of architecture of Cambridge University offers a four-year master’s degree in design! What kind of works can be favored byThe Department of architecture of Cambridge University offers a four-year master’s degree in design! What kind of works can be favored by

Upon graduation, you will obtain the master’s degree of # MDes design. Director of Cambridge natural materials innovation center Professor Michael Ramage, associate dean of the school of architecture, said:

The three districts of Qingdao have completely cancelled the drawing review! However, architectural design should have bachelor degree orThe three districts of Qingdao have completely cancelled the drawing review! However, architectural design should have bachelor degree or

After obtaining the construction permit, the construction unit shall obtain the construction drawing review (spot check) certificate and stamped with the review (spot check) Before the construction drawing design documents