The company shall sort out the drawing disclosure and drawing joint review records for archiving.

The main construction cannot be carried out normally in strong wind and severe winter weather; 2.

Save templates and reduce the input of revolving materials; 3.

After the construction problems are solved in the transfer floor, the later construction speed is greatly improved, and the overall construction period is significantly shorter than the traditional construction period.

During the production of components, complete the thermal insulation, external wall and pipeline embedding, and achieve the effect of no plastering, so as to save the construction period; 5.

(1) The design management department shall issue drawings to all departments for drawing reading and put forward drawing review requirements; (2) The design management department shall organize the Design Institute, engineering management department and business contract department to participate in the joint review of drawings; The supply of commercial housing increased by 19% year-on-year; Average monthly supply of 630000 m; Ordinary houses account for 90%; Guanshan Lake area accounted for 22%, ranking first in the region: the inventory of commercial residential treasure increased by 24% compared with the end of 19; The decontamination cycle is 13 months; The destocking cycle of each region is rising, and some regions are close to 2 years; The sales volume of commercial housing increased by 29% month on month; Average monthly turnover 540000 m; Ordinary housing accounts for 92%; Guanshan Lake area accounts for 30%, ranking first in the region; Zhongtianwu township project No.

I hope you can give me more support without sponsorship.

During the insertion assembly construction, the early construction is slow.

Wire Ring Clutch

There are some limitations in building types.

The traditional external scaffold is not selected for the assembly layer, and there are few materials stored on site; 4.

In this step, it is necessary to ensure that the original structural model will not be changed, otherwise the structural safety will be affected.

In terms of supply and marketing, ordinary houses are still the absolute main force, and the total share of foreign houses and villas is only 8%; The house prices of high-rise and foreign houses decreased year-on-year in 2019, and the house prices of villas increased year-on-year in 2019   Real estate Laolei is an old real estate dog who loves to share.

(3) The waterproof structure design should be able to effectively avoid water seepage, and the parts where the keyway needs to be reserved must be provided with keyway to strengthen the integrity of the connection with the cast-in-situ structure and play a waterproof role.

At present, prefabricated buildings are in the stage of government promotion and are only used for public construction projects,   Most of them are residential; 3.

carried out component deepening design.

The project department implements the whole process control of design.

(1) The deepening process shall be clear and strictly followed.

Since Lan’s disk has been sealed, please reply to “2112023” in the background of this number to ask for PDF document sharing of this article, watching and praising crazy hints that good people are safe all their lives..

The Ka below is the greatest encouragement.

Compared with traditional buildings, the cost of prefabricated buildings is about 15% ~ 20% higher.

After the completion of the deepening drawing design, the general contractor and the design shall conduct a detailed review to find out the component problems and the conflict parts between the prefabricated components and the cast-in-place section in advance.

Energy saving and environmental protection; 2.

PC design is carried out on the basis of traditional design, planning and analyzing the traditional design to determine its feasibility, then carrying out scheme design, and determining the component splitting scheme and node connection analysis.

The market share of Baiyun District, Wudang district and economic development zone has increased significantly.

At the same time, prefabricated buildings have the following shortcomings: 1.

If necessary, BIM model shall be used for simulation to solve the problems before the component production as far as possible; It is not allowed to weaken the drawing review link for the sake of progress and directly put into production, otherwise it may be counterproductive, and more problems will be exposed during the construction of the transfer floor for rectification, which will have an adverse impact on the construction period and quality; (2) The connection nodes related to structural integrity shall not be sloppy, and reliable connection methods must be adopted to design in place, so as to avoid the later opening and joint reinforcement of components, which will affect the connection effect; The connection mode of stressed members and non stressed members shall be clear to avoid confusion and structural change.

-; The average transaction price of commercial housing decreased by 6% month on month The average price of temporary residence is 10194 yuan / MI; The average price of foreign houses is 11920 yuan / MI; The average price of villa is 20588 yuan / M; Guanshanhu District ranks first in the city with 11804 yuan / M; In the past 20 years, the supply and sales of commercial housing increased year-on-year, and the pattern of oversupply remained unchanged; The stock remains in a more rational state; The average price is 6% lower than that in 2019, and the transaction share of the two urban areas, Huaxi District and guanshanhu district has dropped.

The supply of commercial housing increased by 19% year-on-year; Average monthly supply of 630000 m; Ordinary houses account for 90%; Guanshan Lake area accounted for 22%, ranking first in the region: the inventory of commercial residential treasure increased by 24% compared with the end of 19; The decontamination cycle is 13 months; The destocking cycle of each region is rising, and some regions are close to 2 years; The sales volume of commercial housing increased by 29% month on month; Average monthly turnover 540000 m; Ordinary housing accounts for 92%; Guanshan Lake area accounts for 30%, ranking first in the region; Zhongtianwu township project No.

Design quality and schedule management is a systematic project related to schedule preparation, optimization, tracking, evaluation and plan update of implementation, as well as resource allocation and capital demand of the project.

The market share of Baiyun District, Wudang district and economic development zone has increased significantly.

-; The average transaction price of commercial housing decreased by 6% month on month The average price of temporary residence is 10194 yuan / MI; The average price of foreign houses is 11920 yuan / MI; The average price of villa is 20588 yuan / M; Guanshanhu District ranks first in the city with 11804 yuan / M; In the past 20 years, the supply and sales of commercial housing increased year-on-year, and the pattern of oversupply remained unchanged; The stock remains in a more rational state; The average price is 6% lower than that in 2019, and the transaction share of the two urban areas, Huaxi District and guanshanhu district has dropped.

***   The problems of drawings and detailed design of each discipline shall be connected with the design implementation layer and implemented by the design implementation layer.

Thank you very much for your love! (click in to stay)   3 ~ 5 seconds   (3) the project company shall organize the construction unit and the supervision unit to participate in the joint review of drawings, and invite the local quality supervision and safety supervision departments to participate; (4) The design institute shall reply to the questions raised in the joint review of drawings, and the design management department shall review the reply opinions of the design institute and submit them to the company.

(1) Design management shall implement the drawing plan and urge the design unit to draw; (2) After the design institute completes the design drawings, the design management department shall review the drawings and the project company shall review them; (3) After passing the review, the design management department shall issue and register the drawings; (4) Each drawing requesting unit shall sign for the drawings.

In terms of supply and marketing, ordinary houses are still the absolute main force, and the total share of foreign houses and villas is only 8%; The house prices of high-rise and foreign houses decreased year-on-year in 2019, and the house prices of villas increased year-on-year in 2019   Compared with traditional buildings, prefabricated buildings have the following advantages: 1.

Finally, the Design Institute of a company will carry out construction drawing design, CSCEC Technology Wuhan Co., Ltd.

It’s not easy to search.